with the Progress field and might contain the following fields:
- **Progress:** (mandatory). The value of this field is a date and time
- timestamp, in RFC 2822 format. The timestamp provides a time
- annotation for the progress report.
+ timestamp from the UTC timezone, in RFC 2822 format (see 'date -uR' as
+ an example). The timestamp provides a time annotation for the
+ progress report.
- **Percentage:** (optional). An integer from 0 to 100, representing the
completion of the installation planning process, as declared by the